E. 180th Street Station

E. 180th Street Station

 

Project name Rehab of the East 180th Street Station White Plains Road Line (IRT), Bronx
Owner’s contract number A35985/A35986
Owner’s name NYCT
General description of the project type and size The 180th Street Station involved the historic restoration of the administration building and the renovation of an above ground station and new RTO building exterior above tracks. Installation of two elevators for ADA compliant, electrical power upgrade, signal modification as well as installation of four track edges, replacement of tracks, platform sections and platform canopies. The station remained fully operational throughout the entire construction. 

 

Description of scope of work General Contractor responsible for supervising all of the trades. Citnalta oversaw and/ or performed 100 percent of the contract work. The work included selective demolition of the façade and plaster. Citnalta performed staged demolition and erected a sidewalk bridge and safe zone by creating a tunnel for the passengers so that they wouldn’t be inconvenienced during the construction of skylight above mezzanine area, relocation of agent booth and fare array, installation of two elevators and wheel chair ramp for ADA compliant. The work included restoring or replacing the stucco plaster, terracotta copper and clay tile roofs of the 100 year administrative building.  
Original Start and End dates of construction The contract was awarded on 9/9/09 and was scheduled to be complete in 28 months.
Actual Start and End dates of construction Awarded on 9/09/09

Completed on 4/19/13

Dollar amount at award $42,972,000.00
Dollar amount at completion $44,932,468.00