P.S. 19 Queens

P.S. 19 Queens
Project name P.S. 19 Queens
Owner’s contract number C14379
Owner’s name NYC School Construction Authority
General description of the project type and size New 5-story Addition & Existing Building Alterations
Description of scope of work The new 5-story addition, plus cellar, along with the renovated existing building is expected to serve over 2,000 students grades pre-K through 5. The new addition, comprised of precast concrete panel façades with window walls and glass block details, will feature two cafeterias, a new gymnasium, as well as a new enclosed playyard. There will be several separate exercise rooms and art classrooms in the new addition. New addition work also includes 3 staircases and two passenger elevators. Work in the existing building includes asbestos abatement and demolition of existing structures and finishes for the creation of several new classrooms and support offices, such as a guidance suite. HVAC system upgrades in the existing building will include a new rooftop ventilation unit, several new fans and fan coil units, and associated duct, piping, and temperaure controls work. Both buildings will be integrated on one new fire alarm system
Original Start and End dates of construction The NTP was issued on 7/18/2016 and the project was scheduled for completion within 1065 consecutive calendar days of the NTP date, thus establishing a substantial completion date of 06/17/2019 and a final completion date of 12/14/2019.
Actual Start and End dates of construction Awarded on 7/18/2016
Dollar amount at award $95,491,911.00
Dollar amount at completion Contract Ongoing